Planning
Mainbrace Costco Auburn Petrol Station
Mainbrace Costco Auburn Petrol Station

Planning
Mainbrace Costco Auburn Petrol Station

When Mainbrace was contracted to deliver the Auburn Costco Petrol Station, they needed a compliance partner who could move fast. This high-profile infrastructure project demanded AS 1428.4 compliant tactile ground surface indicators and anti-slip stair nosing across the site's pedestrian access points and service areas — all within an aggressive construction timeline.
Total Tactiles was engaged to supply and install tactile indicators at pedestrian crossings, building entries, and accessible pathways, along with heavy-duty stair nosing for service stairs and access platforms throughout the facility.
Petrol station developments present unique compliance and logistical challenges:
High-traffic environment requiring extremely durable materials that can withstand constant vehicle and pedestrian movement
Fast-track construction schedule with zero tolerance for delays
Multiple access points requiring comprehensive tactile installations across the site
Safety-critical areas where slip resistance and visibility are paramount
Coordination with multiple trades working simultaneously across the site
The project required materials built to handle intensive daily use while meeting strict Australian Standards for public infrastructure.

After site assessment and consultation with Mainbrace's project team, Total Tactiles specified:
Cast Iron Tactile Indicators for all pedestrian crossings and building entries. Cast iron was selected for its exceptional durability in high-traffic commercial environments and proven longevity in outdoor applications exposed to vehicle traffic, weather extremes, and constant pedestrian use.
Heavy-Duty Aluminium Stair Nosing for service stairs and platform access areas. Industrial-grade profiles with maximum slip resistance were specified to ensure safety in areas exposed to fuel vapours, weather conditions, and frequent staff access.
Working within Mainbrace's compressed timeline, our installation team executed the project with precision and efficiency:
Rapid site mobilization to align with the fast-track construction schedule
Coordinated installation working around multiple trades and site activities
Quality-controlled substrate preparation ensuring long-term adhesion and performance
Full AS 1428.4 compliance verification at every pedestrian access point
Complete documentation for council approval and safety certification
Every tactile indicator and stair nosing installation was completed on schedule, allowing Mainbrace to maintain their project timeline and deliver the facility to Costco without delays.
The Auburn Costco Petrol Station now features fully compliant tactile ground surface indicators and stair nosing installations designed to withstand the demands of one of Sydney's busiest retail fuel facilities. The cast iron tactiles provide decades of reliable performance under constant traffic, while the heavy-duty stair nosing ensures safe access across all service areas.
Most critically for Mainbrace, the project was delivered without holdups — maintaining their reputation for reliable project delivery on high-profile commercial builds.

This project showcases the value Total Tactiles brings to major infrastructure builds:
✓ Materials engineered for high-traffic environments
✓ Fast mobilization to meet aggressive timelines
✓ Seamless coordination with other trades and site activities
✓ Proven durability in demanding commercial applications
✓ Zero handover delays — keeping critical projects on schedule
From petrol stations and transport hubs to shopping centres and public infrastructure, Total Tactiles delivers compliance installations built to last in Australia's most demanding environments.
Total Tactiles specializes in compliance installations for infrastructure, retail, and commercial developments across Sydney and NSW.
Call: 1800 595 180
Email: sales@totaltactiles.com.au
Quote: Request a Free Quote